8 MONTHS AND 4 DAYS AND THE HOLE IS STILL NOT FIXED

From Nov. 12, 2020 to today (Jun. 16, 2021) there has been this hole cut in my wall in the kitchen. I don't think it's too much to think, if you are going to make a hole, you come back and fix it, yet here it is 8 months and 4 days later. What can I say, this is the joys of subsidized housing, not having things fixed in a timely manner.

Speaking of the tank on my toilet is being held together with silicon calking - sigh. Yeah, it seems to be doing the job but dang, that is a bit Red Green I think (and 2 people get the reference).

Over a year ago I told them the thing that makes the shower come one does not work 100%. This is no big deal for me however, as I can still shower just fine, only it is pumping out twice as much out of the tap than the shower, and wasting a lot of water.

A fried has a relative in the building and the celling in that persons bathroom was damaged by a leak, and it was left open for a very long time as well.

It is demoralizing to have to look at something like that for month after month. You think you don't matter at all to them, you are just a number on a paper some place. I love my neighbors and it's very quiet here, but dang, fix things in a timely manner.
 

Comments

Most Popular In Last 30 Days

SAID Did Not Handle It at All

Feeling Abandoned by the SAID Program (Saskatchewan Disability)

Medical Update (Disturbing Photo Warning)

Accent & Pronunciation Tag